HOUSTON – May, 2019 — Veretek installed its first V-Pump (High Viscosity Multiphase Pump) in a high viscosity well in Long Beach Field on May 8th 2019. Greg Hottle, CEO of Veretek said “this marks a major milestone for Veretek. The V-Pump was originally developed for high viscosity wells but has proven so successful in unconventional fraced wells that the Permian and Bakken have been our main operating areas. We are excited to see this technology trial in a whole new operating environment.”